The CCELL Fixtures for Eazie Bar 1ml are precision-engineered tools developed to support accurate filling, sealing and assembly of the CCELL Eazie Bar all-in-one device. Built for stability and repeatability, these fixtures help extract labs, co-packers and white-label manufacturers maintain consistent production standards across large batches. By keeping each unit properly aligned during the filling and capping process, the fixtures help reduce spills, misalignment and sealing errors making them an essential part of any compliant workflow for AIO device preparation.
Key Selling Points
- Precision Alignment Tooling – Holds Eazie Bar 1ml shells securely in place during filling and sealing.
- Optimized for Batch Production – Streamlines high-volume operations in licensed extraction and co-packing facilities.
- Sealing and Closure Support – Helps ensure proper cap fitment and long-term device integrity.
- Durable Industrial Build – Constructed for repeated use in professional production environments.
- Platform-Specific Design – Engineered exclusively for CCELL Eazie Bar 1ml all-in-one hardware.
What’s in the Box
- CCELL Eazie Bar 1ml filling & assembly fixture
- Tooling components required for stabilization and alignment
